Myton School, Warwick

Project Overview

Date:

2024

Sector:

Education – Secondary School

Project Scope:

Full enabling works, modular building installation, infrastructure and utilities integration, attenuation system, access road and footpaths, cladding, and complete internal electrical fit-out for educational facilities.

Location:

Warwickshire

Myton secondary School 4

Project Description

We were entrusted with the successful delivery of a large-scale modular installation at a school in Warwickshire – a multi-million-pound project that required meticulous coordination across multiple disciplines.

The aim was to provide the school with modern, flexible teaching facilities through a turnkey modular solution.
The project began with extensive enabling works to prepare the site for the new modular buildings.

We constructed a new access road to improve site logistics and long-term accessibility. All essential services were installed, including water, power, and drainage connections, ensuring that the modular units were fully operational from day one.

A key element of the infrastructure was the installation of a large attenuation tank to manage surface water runoff effectively and support sustainable drainage. To enhance pedestrian access and safety, we constructed macadam footpaths linking the modular blocks with the rest of the campus.

Externally, the buildings were finished with sleek modern cladding, giving them a polished, professional look that complements the existing school environment. Internally, we carried out a complete electrical fit-out, powering classrooms, science labs, administrative offices, and communal areas – all tailored to the daily demands of a busy educational setting.

The result is a set of high-quality, future-proof modular facilities that now play a vital role in Myton School’s operations, supporting both current and future generations of students.

Our Approach

At MSE, our approach is rooted in detailed planning, open communication, and a deep understanding of our clients’ operational needs – especially in live education environments.

From the outset at Myton School, we worked closely with school leadership and local authorities to develop a phased programme that prioritised safety, efficiency, and minimal disruption to the school community.

Our in-house teams managed every aspect of the project, from groundworks to final finishes, allowing us to maintain strict quality and scheduling standards.

Health and safety remained a core focus throughout, particularly given the active school setting. We also implemented sustainable construction practices, including an attenuation system designed to support environmentally responsible site drainage.

We believe in delivering value beyond the build – through trust, professionalism, and solutions that truly serve our clients’ long-term goals.

Why Choose MSE:

Comprehensive Solutions

We manage every phase of delivery, from enabling works to final handover, ensuring consistency and accountability.

Experience in Education:

Our team has a proven track record of working in live school environments, balancing speed with safety and sensitivity.

Collaborative Delivery

We prioritise partnerships, engaging openly with clients and stakeholders at every stage to keep projects aligned and on track.

Sustainability Built-In

Our projects integrate smart, sustainable infrastructure—from attenuation tanks to efficient building services.

Reliable Results

We’re known for delivering high-quality, future-ready buildings - on time, on budget, and built to perform.

Client Feedback

MSE were fantastic throughout. They approached the project with professionalism and a clear understanding of what was required in a school environment. Their team was flexible, well-organised, and always responsive

From the initial conversations, we could tell MSE had a strong grasp of modular construction and how to execute it efficiently. They quickly understood our priorities and were proactive in offering practical solutions

Exceptionally well. They adhered to the agreed timeline, kept disruption to a minimum, and maintained high standards throughout. The quality of work, especially with the infrastructure and finish, exceeded our expectations.

Their reputation and previous experience with similar education projects gave us confidence. They provided a clear, competitive proposal and demonstrated that they could handle the complexity of the site and scale of works.

You’re in safe hands. MSE are experienced, dependable, and deliver exactly what they promise. We wouldn’t hesitate to recommend them to other schools or organisations with complex modular or infrastructure needs.