Project Description
Total electrical Installation to new factory, the works were carried out within the client’s timescale of 10 weeks to enable them to start production as soon as they moved in. New electrical distribution panel with energy meters was installed. Existing and new machines were fed via high level Canalis trunking with cable tray droppers to local isolators. Upon completion client received full operations manual with typed BS 7671 test results.
Project Value: £180,000.00