Another project successfully completed by the team at MSE!

Here’s what the team delivered:

Site Preparation: Fencing, signage, and site setup to keep things safe and running smoothly.

Foundations: Excavated concrete foundations with PCC piers to support the modular units.

 

Drainage & Water Connections: A comprehensive pump installation for the foul drainage system, stormwater pipework, along with mains water. All connected to existing infrastructure.

Electrical Works: Supplied and installed SWA cabling to all cabins as well as power supply to the foul pump system.

 

Exterior : Aluminium composite panels were used to clad the cabins. We also installed a 1.2m high picket fence around the cabins to provide safe play areas.

 

A great project delivered on time and to a high standard – top work from everyone involved

 